Handing Over and Maintenance:
The Works will be handed over to the client in a ready-to-use condition upon completion of all required government formalities.
The Works will be maintained for a period of 365 days starting from the date of issuance of the certificate of completion.
Contract Drawings Handling Procedure
1.Receipt and Distribution:
• Upon receiving the original contract drawings from consultants or clients, one copy will be retained at the Head Office (HO) for record-keeping.
• Two additional copies will be sent to the site for execution purposes.
2.Review and Implementation:
• Our project engineers thoroughly review every detail of the drawings.
• The details are discussed with the workforce and supervisors to ensure that all work is carried out as per the drawings.
• Any changes issued by the consultant/client will be incorporated into the site office drawings and a copy will be sent to the HO for record-keeping and for managing variations or time claims.
3.As-Built Drawings:
• At the end of the project, all site changes will be documented and updated into the final drawings.
• These as-built drawings will be provided to the client for their records.
• A detailed register will be maintained by the site team to document all changes during execution.
• This register will be available for review and submission to the client or consultant as required, covering time and cost variations.
• Upon receipt of the work order, a pre-assigned site team will immediately take charge of the project. • Mobilization activities will be supervised by a designated project manager to ensure a smooth start.
1. General Materials:
• A material schedule will be prepared by the project engineer and planning engineer, including details such as material name, required date, approval status, budget, and current status.
• Upon arrival, materials will be inspected by the site engineer for compliance with consultant approvals, and the storekeeper will verify quantities and check for any damage.
• Materials will be properly stored and issued to the workforce as needed, following the site engineer’s instructions.
Preference will be given to locally made materials, provided they meet the required specifications.
• Approved material samples will be retained on-site throughout the project duration until project handover.
• Our site staff consists of highly experienced professionals who have extensive experience in Oman.
• They are well-versed in various types of structures and finishes, ensuring high-quality workmanship across all projects.